Airport Trains Operate Duri-Tangerang KRL Has Longer Waiting Time
By : Wiyanto And Aldi Firhand. A | Thursday, January 04 2018 - 20:54 IWST
Soekarno-Hatta Airport Train (ist)
INDUSTRY.co.id - Jakarta - The existence of the operation of KRL Train Airport resulted in the tripling of Duri-Tanggerang KRL trip. It is planned that out of 90 travel partners will be only 72 travel relation operated.
What is the fate of passengers who do not miss train at the time of going to goal? while the train arrival schedule is delayed longer.
President Director of PT Kereta Commuter Indonesia (KCI) Muhammad Nurul Fadhila admitted
Pause the distance (headway) will be delayed from 15 minutes once to 30 minutes.
"Headway will be longer, the number of passing trains that became its concentration, should not be avoided baseball," he said in Jakarta, Thursday (4/1/2017).
This headway will apply, he said, if the Airport Train enforces 80 trips that currently only 42 trips.
Then, KCI is preparing the addition of carriage from 10 carriages to 12 carriages in anticipation of accumulation of passengers due to Headway longer.
"Please KRL passengers whose timing is not appropriate, in order to use other modes of transformation, because we can not force the schedule according to the old one because it shares with the Airport Train," he said.
News Comment