Minister Jonan Encourages the Development of Communal Biogas Based on Potential of Renewable Energy

By : Hariyanto And Aldo Bella Putra | Saturday, April 07 2018 - 21:30 IWST

Menteri Energi dan Sumber Daya Mineral (ESDM) Ignasius Jonan
Menteri Energi dan Sumber Daya Mineral (ESDM) Ignasius Jonan

INDUSTRY.co.id - Pasuruan - Minister of Energy and Mineral Resources Ignasius Jonan inaugurated the installation of a communal scale biogas at Pondok Pesantren Terpadu Al-Yasini in Areng-areng Village, Wonorejo Sub-district, Pasuruan Regency, East Java on Saturday (7/4/2018).
The installation of the communal biogas treats human waste for biogas with a biogas digester capacity of 24 cubic meters, capable of producing 81 cubic meters of gas per month, equivalent to 12 LPG tubes of 3 kg per month. In addition to cooking, biogas can also be used for lighting.
The construction of communal biogas installation includes 50 units of WC, biogas digester with capacity of 2x12 cubic meters of fixed dome concrete type, wastewater treatment plant (IPAL) with a capacity of 180 cubic meters, 2 units of biogas lamps and 4 units of biogas stoves.
The cost of constructing a communal biogas installation is sourced from the 2017 APBN and commenced operations in October 2017.
"The APBN is prioritized for development that has a direct impact on the community, should be directly beneficial to the community," said Minister Jonan.
The benefits of this communal biogas program include saving the cost of cooking, reducing dependence on fossil energy and LPG imports, and reducing greenhouse gas emissions.
For the initial stage, the utilization of communal biogas can reduce the use of 3 kg of LPG per month by 3 tubes, up to 12 tubes under optimal conditions. So it can mengemat monthly expenditure starting from Rp. 75,000 to Rp. 300,000.
In addition to the addition of WC construction, also built wastewater treatment plants that can improve the quality of waste water management in the pesantren environment.
"The addition of 50 WC can reduce the queue time of the santri so that students can be more timely to come to the study room.For cooking also become more efficient because the use of LPG we can reduce.In addition, the time of cooking queue is also so much faster because there is an increase in the number stove, "said Chairman of Al-Yasini Integrated Ponpes Foundation, Zainudin.
Minister Jonan also said that the development of communal biogas is one of the Government's efforts to increase energy access to the community and encourage the utilization of energy from resources based on local renewable energy potential.
The development of a communal biogas installation is part of renewable energy utilization as an effort to realize the national energy mix target. Management of biogas from waste can create a synergetic pattern of waste management that is the utilization of affordable energy and environmentally friendly energy, starting from a small scale.
On this occasion, Minister Jonan also expressed his appreciation and appreciation to Pasuruan Regency Government and Pondok Pesantren Al-Yasini that have cooperated to support the implementation of renewable energy program based on bioenergy (Biogas Komunal) in the boarding school.
For information, Al-Yasini Integrated Pondok Pesantren was established in 1940. At the beginning of the pesantren activities in the form of Qur'an recitation took place in the mosque followed by santri mukim and santri community around the pesantren. Currently, the number of students staying at this Ponpes is about 3,000 people consisting of 1,200 male students and 1,800 female students.

News Comment

Today's Industry

Qatar Airways

Jumat, 03 Februari 2023 - 21:51 WIB

Qatar Airways And Airbus Reach Amicable Settlement In Legal Dispute

Qatar Airways and Airbus are pleased to have reached an amicable and mutually agreeable settlement in relation to their legal dispute over A350 surface degradation and the grounding of A350…

Asia-Pacific Universal Robots

Jumat, 03 Februari 2023 - 19:31 WIB

Universal Robots reports record revenue despite global uncertainty

Universal Robots, the Danish collaborative robot (cobot) company, has reported Q4 revenue of USD 85 million, bringing 2022 annual revenue to USD 326 million, up 5% on 2021. On a constant currency…

PT Jababeka Tbk realized a Rooftop Solar Power Plant (PLTS) and formed the Jababeka Net Zero (JNZ) Forum. The inauguration of PLTS Atap in Jababeka-Cikarang place at the President Executive Club.

Jumat, 03 Februari 2023 - 17:19 WIB

Committed to Being a Net Zero Industrial Estate, Jababeka Inaugurates PLTS Atap and Jababeka Net Zero Forum

After announcing and signing a commitment towards a net zero industrial cluster at the B20 Summit at the G20 Summit series last November 2022, PT Jababeka Tbk realized a Rooftop Solar Power…

Jababeka & SD Darmono Won an Award at PropertyGuru 2022

Jumat, 03 Februari 2023 - 16:00 WIB

Jababeka & SD Darmono Won an Award at PropertyGuru 2022

PT Jababeka Tbk through one of its subsidiaries namely Jababeka Residence, received an award as the Best Mega Township Development at the PropertyGuru Indonesia Property Award 2022, at the Ritz…

Jababeka Net Zero Cluster Announced at World Economic Forum 2023 in Davos- Switzerland

Jumat, 03 Februari 2023 - 15:30 WIB

Jababeka Net Zero Cluster Announced at World Economic Forum 2023 in Davos- Switzerland

PT Jababeka Tbk (Jababeka) is fully committed to helping realize Indonesia’s vision of achieving carbon neutrality by 2060. One of the concrete actions taken by Jababeka is to declare an ambition…