Lebaran Completed, PLN Reactivate Power Plant 5,000 MW

By : Ahmad Fadhli And Aldo Bella Putra | Friday, June 22 2018 - 15:30 IWST

Pembangkit Listrik
Pembangkit Listrik

INDUSTRY.co.id - Jakarta - PT PLN (Persero) reactivated a number of power plants that had been shut down during the Idul Fitri 2018 holidays. The reactivated power plant has a total capacity of 5,000 megawatts (MW).
"It's all right. It's already started (activated generator). Maybe not full 7.000 MW, but 5,000 MW will come in, "said Syofvi Roekman, PLN Planning Director in Jakarta, Friday (22/6/2018)
During operation during Idul Fitri, PLN periodically blackouts the steam power plant (PLTU).
In total there are 18 power plants that get a quota of blackouts in rotation with a total capacity of 7,700 MW for the Java island as the region with the highest consumption level in the country. While the peak load on a typical day reaches 25.8 thousand MW.
For the Java Bali region alone, PLN's capacity capacity reaches 33.6 thousand MW. Based on the calculation, PLN has the potential to lose up to Rp 2.036 trillion with the decrease of consumption.
According Syofvi normalization of new power supply will actually be implemented next week. But it also follows the needs of the community. "Next week should be normal. Next week already entered again, adjusted the same load dong. Adjusted as needed, "he concluded

News Comment

Today's Industry

Vice President Ma’ruf Amin during Closing of National Conference on Public Security and Defense System, at Sentul, West Java province, Friday (18/6). (Photo: Vice President Secretariat)

Minggu, 20 Juni 2021 - 19:24 WIB

VP Calls for Increased Role of Security, Defense System Amid Global Challenges

The role of security and defense system should be strengthened to protect the entire nation, state and all citizens in facing the increasing global challenges, Vice President Ma’ruf Amin has…

Minister of Women Empowerment and Child Protection I Gusti Ayu Bintang Darmawati (Source: PR of Cabinet Secretariat)

Minggu, 20 Juni 2021 - 18:45 WIB

Gov’t Unveils Strategies to Eradicate Child Labor

In a bid to protect children’s rights in Indonesia, Ministry of Women Empowerment and Child Protection has unveiled a number of strategies to eliminate child labor in the country.

Minister of Energy and Mineral Resources Arifin Tasrif. (Photo by: PR of Cabinet Secretariat)

Minggu, 20 Juni 2021 - 17:30 WIB

Gov’t Gears Up to Finalize Regional Energy Plan Next Year

The Government has pushed for the finalization of multi–sectorial energy policies in the form of Provincial Energy General Plan (RUED-P). The RUED-P is expected to be completed next year.

President Jokowi, accompanied by West Java Governor Ridwan Kamil, in Bogor regency from Pakansari Stadium in Cibinong sub-district, West Java province. (Photo: Bureau of Press, Media, and Information of Presidential Secretariat/Lukas)

Minggu, 20 Juni 2021 - 16:15 WIB

President Jokowi Inspects Mass Vaccination for Public and People with Disabilities at Pakansari Stadium

President Joko “Jokowi” Widodo Thursday (17/06) inspected mass vaccination at Pakansari Stadium in Cibinong sub-district, Bogor regency, West Java province.

President Jokowi inspects mass COVID-19 vaccination at Bogor Train Station, West Java (17/06/2021). (Source: YouTube Channel of Presidential Secretariat)

Minggu, 20 Juni 2021 - 15:47 WIB

President Jokowi Calls for Vaccination Acceleration in Areas with High Interaction and Mobility

In a bid to achieve community immunity or herd immunity, the Government is set to boost vaccination, especially in areas with high public interaction and mobility.