Chandra Asri Invests US $ 350 Million to Build New Polyethylene Plant

By : Abraham Sihombing And Aldi Firhand. A | Monday, February 05 2018 - 21:50 IWST

PT Chandra Asri Petrochemical Tbk (TPIA)
PT Chandra Asri Petrochemical Tbk (TPIA)

INDUSTRY.co.id - Jakarta - PT Chandra Asri Petrochemical Tbk (TPIA) started to build a new polyethylene (PE) plant in Cilegon petrochemical complex, Banten Province. It was marked by the groundbreaking for the construction of the plant.

"The polyethylene plant with a production capacity of 400 kilo tons per year (KTA) will be built with an investment of US $ 350 million. Construction of the plant is expected to be completed by the end of 2019 so that it can start operating in early 2020, said Erwin Ciputra, Managing Director of TPIA, in Jakarta on Monday (05/02/18).

Erwin said the new plant will produce High Density Polyethylene (HDPE), Linerar Low Density Polyethelyne (LLDPE), and Metallocene LLDPE.

"LLDPE and HDPE are usually used as raw materials to produce blown films, rice bags, toys, bottle caps, shopping bags, household appliances, ropes, tarpaulins, pipes, container boxes and so on," Erwin said.

Erwin said, the construction of the factory aims to anticipate the high demand of PE in the domestic market as the rapid development of plastic and packaging industry in Indonesia.

"PE demand in Indonesia is currently predicted to reach 1.4 million TPA and will continue to increase in line with the growth of gross domestic product (GDP), said Erwin.

Erwin explained, the new PE factory will produce more PE products to meet domestic needs as a substitution and reduce foreign exchange outflow.

Currently, the company operates a PE factory with a production capacity of 336 KTA. Therefore, the construction of a new PE plant with a capacity of 400 KTA is expected to increase the production capacity of the company's PE to 736 KTA.

News Comment

Today's Industry

President Jokowi Attends WCAS COP28 in Dubai

Senin, 04 Desember 2023 - 20:48 WIB

President Jokowi Attends WCAS COP28 in Dubai

President Joko “Jokowi” Widodo attended the World Climate Action Summit (WCAS) COP28 that was held at Expo City Dubai, Dubai, United Arab Emirates (UAE) on Friday (12/1). Arriving at around…

Presiden Jokowi (Foto : Biro Pers Setpres)

Senin, 04 Desember 2023 - 20:41 WIB

President Jokowi, Norwegian PM Discuss Investment Cooperation

On the sidelines of the World Climate Action Summit (WCAS) COP28, President Joko “Jokowi” Widodo Friday (12/11) held a bilateral meeting with Norwegian Prime Minister Jonas Gahr Støre in…

President Jokowi, President MBZ Discuss Enhancement of Indonesia-UAE Cooperation

Senin, 04 Desember 2023 - 20:36 WIB

President Jokowi, President MBZ Discuss Enhancement of Indonesia-UAE Cooperation

President Joko “Jokowi” Widodo on Friday (12/01) had a face-to-face meeting with the President of the United Arab Emirates (UAE), Sheikh Mohamed bin Zayed Al Nahyan (MBZ), at the Leadership…

President Jokowi, UN Secretary General Discuss Climate Action, Gaza Situation Read more: https://setkab.go.id/en/president-jokowi-un-secretary-general-discuss-climate-action-gaza-situation/

Senin, 04 Desember 2023 - 20:32 WIB

President Jokowi, UN Secretary General Discuss Climate Action, Gaza Situation

President Joko “Jokowi” Widodo Saturday (12/02) reaffirmed Indonesia’s commitment to continuously support the United Nations (UN) in carrying out its functions and roles amid increasingly…

President Jokowi Unveils Indonesia’s Steps to Reach Net Carbon Sink in Forestry, Land Sectors

Senin, 04 Desember 2023 - 20:28 WIB

President Jokowi Unveils Indonesia’s Steps to Reach Net Carbon Sink in Forestry, Land Sectors

Indonesia is taking systematic and innovative steps in achieving a net carbon sink or net carbon absorption in the forestry and land sectors by 2030, President Joko “Jokowi” Widodo has said.…