Pulauintan Development Complete Veranda Residence @ Puri

By : Herry Barus And Aldi Firhand. A | Monday, September 04 2017 - 09:56 IWST

Apartment Illustration (Illustration)
Apartment Illustration (Illustration)

INDUSTRY.co.id - Jakarta- Pulauintan Development, through one of its subsidiaries PT Mutiara Puri Indah in cooperation with PT Pulauintan Bajaperkasa Konstuksi as the contractor successfully completed the construction of Veranda Residence @ Puri in Puri Indah area, West Jakarta.

President Director of PT Mutiara Puri Indah, Hadi Kusuma in Jakarta recently said that the development of the strata title apartment refers to the master plan and presents the landscape and the use of quality building materials.

"Currently in the process of handover, most of the residents are young families and the owners are also expressing their satisfaction over the handing over and the services provided," Hadi said as quoted by Antara.

Veranda Residence @ Puri is a 31-storey apartment with a total of 166 residential units. Three basement floors and 63 service residence units. Designed, by combining elements of wood and marble complete with kitchen sets of each unit.

Not only that the main door using Baldwin hardware, home cinema using Bose sound system, as well as fitness devices using Gym Technologym, in the roof area equipped with park facilities, library, meeting room, children playground, swimming pool, and barbecue area.

"There are only eight residential buildings per floor with three unit variants (1BR-3BR) of semigrosss ranging from 67.93 to 143.35 square meters." The design is only Rp 1.7 billion, excluding VAT, "he added.

Besides being able to live comfortably, Hadi, owner of Veranda Residence @ Puri can move to the central business district of Jakarta (CBD Sudirman) and surrounding areas easily through the citrus citrus access point.

"West Jakarta itself, when considering the design of the DKI Jakarta area, is placed into a new business center area after South Jakarta," he said.

Based on Kembangan 2016 Regional Statistics is the center of West Jakarta Municipal Administration and is very suitable to be an elite residential and office area, shopping center (mall and culinary center) with the support of public facilities such as Puri Indah Hospital, IPEKA International, Springfield and Notredame education.

"Geographically, South Kembangan and around Pasanggrahan street, Puri Indah is located in the middle of Kembangan subdistrict map, or between North Kembangan and North Meruya, it is very strategic because it is passed by the Outer Ring Road of Jakarta," he said.

Through the Jakarta outer ring toll road (JORR West 1) Kebon Jeruk-Penjaringan section, it becomes the connecting highway from West Jakarta and South Jakarta to Soekarno Hatta Airport.

Based on Jabodetabek Urban Railway Network Map 2020, Jakarta Provincial Government will develop the 4th Corridor LRT Corridor 4, Puri Kembangan-Tanah Abang project for 9.3 kilometers to accelerate the mobility of the surrounding community.

News Comment

Today's Industry

Pirelli Tires

Sabtu, 20 Januari 2018 - 23:22 WIB

Astra Otoparts Cooperates with Pirelli to Launch Underbone Motorcycle Tire

PT Astra Otoparts Tbk (AUTO) through PT Evoluzione Tires in collaboration with Pirelli Tyre S.p.A presents Ban Diablo Rosso Corsa II specially designed for underbone motorcycles officially launched…

Minister of transportation Budi Karya Sumadi

Sabtu, 20 Januari 2018 - 23:17 WIB

RI-Japan Agree on Port of Patimban Subang Settlement Next Year

Indonesia and Japan agreed to the completion of the Patimban Port project in Subang, West Java, which is targeted to be completed next year.

Minister of Transportation Budi Karya Sumadi reviewed the LRT project

Sabtu, 20 Januari 2018 - 22:55 WIB

Six Indonesian-Japanese Infrastructure Industries Work Accelerated

Japan accelerated the completion of six major infrastructure projects in Indonesia as agreed by President Joko Widodo and Japanese Prime Minister Shinzo Abe.

PT Indonesia Asahan Alumunium (Inalum)

Sabtu, 20 Januari 2018 - 22:50 WIB

Inalum Targets Smelter Alumina Project Start Producing By 2021

PT Inalum (Persero) targets a smelter alumina project with Antam Tbk (ANTM) and Chalco to produce in 2021, following construction scheduled to begin in the second half of next year.

Menhub Budi Karya Sumadi (humas kemenhub)

Sabtu, 20 Januari 2018 - 22:45 WIB

Fast Train Technologies Jakarta-Surabaya Has Been Determined

The choice of (semi) fast Jakarta-Surabaya train technology has been conical to be determined but still requires more detailed study, said Transportation Minister Budi Karya Sumadi.