PT Adhi Karya Develop LRT City in Bekasi

By : Kormen And Aldi Firhand. A | Monday, November 27 2017 - 11:50 IWST

Illustration Shelter Integrated with public transportation modes such as Transit Oriented Development (TOD)
Illustration Shelter Integrated with public transportation modes such as Transit Oriented Development (TOD)

INDUSTRY.co.id - Bekasi - Increased infrastructure development and transportation facilities by the government to meet the needs of urban communities with high mobility. The condition of the capital's transportation traffic today, can be said as transportation emergency.

The central government also intensified the movement to overcome these conditions, not to mention construction companies as the government's driving wheel in building infrastructure.

Maximizing the use of mass transportation by the community should be encouraged by meeting the needs of the people around the station area.

The development of mass transit is indirectly affecting the development of property market share based on Transit Oriented Development (TOD).

PT Adhi Karya (Persero) Tbk, through the Department of Transit Oriented Development (TOD) & Hotel provide solutions to the community by presenting LRT City.

LRT City is a residential and commercial area located in an integrated area and directly connected with mass transportation system, one of them is Light Rail Transit (LRT) Jabodebek.

LRT City brings the approach of Transit Oriented Development and compact city development, adopting mixed-use, maximizing the use of mass transit such as LRT and BRT equipped with pedestrian / bicycle network.

Setya Aji Pramana, LRT City Project Manager East Bekasi - Eastern Green, said LRT City is present at several points of LRT line, with a very strategic position and ease of accessibility, one point with LRT station (0 Km LRT Station). "It's just a step to get to LRT Station that will bring to the business center in Jakarta. Therefore, we are very optimistic LRT City can be absorbed by the market, "said Setya Aji Pramana, in a press release, received by the editor Monday (27/11/2017).

According to him, LRT City East Bekasi - Eastern Green with an area of ​​16.9 ha is an integrated vertical residential area (apartment) equipped with a commercial area that is currently in the process of selling and will be handed over in 2019.

With the concept of Green Smart Living in East Jakarta, the facilities offered by this area are Mall, commercial area, plaza, cinema, swimming pool and other interesting facilities. Phase 1 was built since 2016, with the first tower of 20 floors and consisting of 634 units. Eastern Green is marketed with prices ranging from Rp 500,000,000 with an investment value of more than Rp 500 billion.

Setya Aji added that LRT City not only builds an area but also builds a community that will be a place for all Indonesian people who intersect with LRT City and call it Elartizen. "To start the community, we interacted very much with Elartizen candidates with every two times a month we held an open house located in LRT City areas," said Setya Aji

News Comment

Today's Industry

Aman Abdurrahman.terdakwa kasus terorisme (Foto Dok Industry.co.id)

Jumat, 22 Juni 2018 - 18:30 WIB

South Jakarta District Court Judge Sentenced to Death of Oman Abdurrahman

South Jakarta District Court Judge Akhmad Jaini sentenced the defendant to the terrorist case of Oman Rochman alias Abu Sulaiman bin Ade Sudarma alias Aman Abdurrahman at the South Jakarta District…

PT Electronic City Indonesia Tbk (ECII) (Foto Dok Industry.co.id)

Jumat, 22 Juni 2018 - 17:30 WIB

Throughout 2017, Electronic City Income Reach Rp1, 8 Trillion

PT Electronic City Indonesia Tbk (ECII) revenues in 2017 reached Rp1,818 trillion, up 9.6 percent from Rp1,659 trillion in 2016.

PT Electronic City Indonesia Tbk (ECII) (Foto Dok Industry.co.id)

Jumat, 22 Juni 2018 - 16:30 WIB

Electronic City Spends Rp 35 Billion on Expansion

PT Electronic City Indonesia Tbk (ECII) this year poured Rp35 billion for business expansion by opening five new outlets.

Pembangkit Listrik

Jumat, 22 Juni 2018 - 15:30 WIB

Lebaran Completed, PLN Reactivate Power Plant 5,000 MW

PT PLN (Persero) reactivated a number of power plants that had been shut down during the Idul Fitri 2018 holidays. The reactivated power plant has a total capacity of 5,000 megawatts (MW).

Ketum Partai Gerindra Prabowo Subianto (Foto Dok Industry.co.id)

Jumat, 22 Juni 2018 - 14:30 WIB

General Chairman Gerindra Prabowo Subianto Attends the Last Debate of NTT Governor Election

East Nusa Tenggara Governor number 1 Esthon Foenay said in the last candidate debate to be held by the local KPU on Saturday (23/6) tomorrow, Gerindra Prabowo Subianto Party Chairman will witness…